top of page
Begin High Way – Jerusalem
Design and implement
> Fiber optic cables along the highway.
> Droop of cabinets along the highway.
> Video camera modems connected to control room.
> Fire /smoke detection in tunnels connected to the control room.
> PLC scada communication transferred to control room.
bottom of page